If your Richmond attic is thin on insulation, the usual fix is to air seal it and blow new insulation on top of what's there: R-49 added over 3 to 4 inches, or R-60 in a bare attic. We measure the depth you have now, put the R-value we'll reach in writing, and then do the work. Ask for a free attic check and we'll come out and look.
Aim for R-60 in a bare attic. If you already have 3 to 4 inches, add R-49 on top. That's the recommended level for Richmond's climate zone, 4A. It is guidance, not the code.
Virginia's 2021 code raised the attic minimum in zones 3 and 4 from R-49 to R-60. What that means for an existing house is on the Virginia R-value page.
Half the homes in Richmond were built before 1959. A house that age may have only a few inches of old insulation up there, which is why we measure before we quote.

A hot upstairs in summer is the clearest sign. Here's what else to look for:
Summer sun heats the roof, and a thin layer lets that heat drop straight through the ceiling into the rooms below. If you want to cut that heat further, a radiant barrier is one option we can talk through.
Dry insulation stays and the new layer goes on top. If it's wet, stained or musty, the roof or a flashing is leaking, and the leak gets fixed first. When old material has to come out is on the removal page.
For an attic floor, blown-in insulation is the usual answer. It fills around wiring, framing and odd corners, and it goes right over what's already there. We blow in fiberglass or cellulose.
Either one gets your attic to the R-value in your estimate. Cellulose is denser and settles a little more; fiberglass is lighter. Our installed price ranges for the two are the same, so choose on the house, not the price. More on each at fiberglass, cellulose and blown-in.
Batts work in a wide-open attic with few obstructions.
If ductwork or an air handler sits up there, foam under the roof deck can make sense; the roof deck page explains when.
We seal the air leaks first, then insulate. A deep layer over open gaps around wiring, plumbing and light fixtures still lets air through. Air sealing is a separate line on your estimate, so you see what it adds.
Before any insulation goes down, we check:
Any season works. Spring and fall are easier on the crew, because an attic in midsummer is brutal to work in. If your upstairs is already too hot, don't wait for a mild week.
How long your attic takes depends on its size, the layout and whether air sealing comes first. We tell you when we've seen it. On the day:
Before we arrive, clear a path to the attic opening and move stored boxes off the floor we're covering. Want it looked at? Request a free estimate.
Four things move the price: the size of the attic, how much insulation is already there (a top-up costs less than a bare attic), how easy it is to get into and move around in, and whether air sealing comes first. Our installed ranges are on the attic insulation cost page.
We stop, show you what we found and tell you what has to be fixed before insulation goes in, such as a roof leak or old wiring. If we see loose, pebbly vermiculite, we stop and send you to a Virginia-licensed asbestos contractor.
Often yes. We can blow insulation around and under boards that are already down. If a section is in the way, we tell you before we start.
We'll measure what you have and put the R-value we'll reach in writing. Call us or send the estimate form.
Licensed & insured · Free estimates